PERI scope 01/2004, International
Magazine for Formwork and Scaffolding 1/2004 Edition, International
For small and large construction sites PERI has the solution Safe and cost-effective
Over the links you will be directed to the HTML version of the presented projects.
For small and large construction sites PERI has the solution Safe and cost-effective
Over the links you will be directed to the HTML version of the presented projects.
Toll station for the Millau Bridge, France
On-site production of prefabricated parts: Dimensional accuracy and high concrete quality
European Patent Office, Munich
More room for ideas with system equipment for all requirements
New Staff Restaurant, Biberach, Germany
Accurately designed and delivered pre-assembled Formwork for an extraordinary building core
Athens, Greece
Construction for the Olympic Games: Fast system equipment for tight schedules
Tunnel by-pass, Flueelen, Switzerland
Four tunnel casting lengths in only 9 days
S1 Tunnel Rannersdorf, Austria
Hydraulic shuttering and stripping: Easy to operate modular formwork carriage
Sanatorium for visually handicapped, Starnberg/Soecking, Germany
Walls more efficiently formed with TRIO-H: Fewer ties – quicker shuttering times
Sunjuet Plaza, Business Centre, Istanbul, Turkey
Efficient crane climbing formwork for shorter construction time and high quality execution
Access Ramp, Wohnland Rogg, Reutlingen, Germany
PERI RUNDFLEX: easy radii adjustment and fast element connections
Scala Opera House, Milan, Italy
Coordinated formwork and scaffolding use for complex construction progress
On-site production of prefabricated parts: Dimensional accuracy and high concrete quality
European Patent Office, Munich
More room for ideas with system equipment for all requirements
New Staff Restaurant, Biberach, Germany
Accurately designed and delivered pre-assembled Formwork for an extraordinary building core
Athens, Greece
Construction for the Olympic Games: Fast system equipment for tight schedules
Tunnel by-pass, Flueelen, Switzerland
Four tunnel casting lengths in only 9 days
S1 Tunnel Rannersdorf, Austria
Hydraulic shuttering and stripping: Easy to operate modular formwork carriage
Sanatorium for visually handicapped, Starnberg/Soecking, Germany
Walls more efficiently formed with TRIO-H: Fewer ties – quicker shuttering times
Sunjuet Plaza, Business Centre, Istanbul, Turkey
Efficient crane climbing formwork for shorter construction time and high quality execution
Access Ramp, Wohnland Rogg, Reutlingen, Germany
PERI RUNDFLEX: easy radii adjustment and fast element connections
Scala Opera House, Milan, Italy
Coordinated formwork and scaffolding use for complex construction progress
