PERI scope 1/2006, International
PERI scope 01/2006, International
Magazine for Formwork and Scaffolding 1/2006 Edition, International

PERI provides solutions for small and large construction sites safely and cost-effectively

Over the links you will be directed to the HTML version of the presented projects.
Production facilities in Penzberg, Germany
System materials with safety equipment for boosting productivity

Discharge Facility & Flood Control Storage Basin, Glatten, Germany
Efficient forming and reinforcement work with PERI TRIO and PERI UP

CIS/Interporto di Nola Service Centre, Naples, Italy
PERI UP Rosett: Fast and safe assembly, maximum adaptability

Hilton Plaza, Warsaw, Poland
Climbing formwork and facade scaffolding from one source

McAllister Academic Village, Phoenix, USA
Schedule maintained SKYDECK for slabs, TRIO for walls

Air Traffic Control Tower, Edinburgh Airport, Scotland
Safe working conditions at great heights - CB climbing scaffold, shaft platforms, RUNDFLEX

Mega Bridge, Industrial Ring Road, Bangkok, Thailand
Weekly cycle of four 173 m high pylons simultaneously with PERI ACS*

Royal Danish Theatre in Copenhagen, Denmark
Optimal systems and perfect service for problem-free construction progress

Concrete casing for liquid gas tank, Aumale, France
Accuracy and safety Climbing formwork with PERI RUNDFLEX

Bridge superstructure, A93 motorway junction, Kiefersfelden, Germany
Time savings on the construction site with pre-assembled PERI raised formwork units

“Am Smalle Haven“ highrise complex, Eindhoven, Netherlands
Cost-effective system combination for core, walls and slabs

Lötschberg Tunnel, Switzerland
Modular tunnel formwork in the world´s third-longest tunnel

National Museum for Contemporary Art (MAXXI) in Rome, Italy
14 m high twisted walls in architectural concrete

Animal Overpass, Zehun, Czech Republic
Expertly planned and fast delivered a perfect match of formwork and shoring