VARIO GT 24 is the wall formwork with continuously adjustable element connections for all designs and applications.
|
|
At the Al Muneera project in Abu Dhabi, Al Futtaim Carillion chose to use the VARIO GT 24 system for walls and columns as it could be used in all areas, being a versatile system with a built in safety.
|
|
The decisions which formwork system should be used in the different areas were done based on the calculations of the technical support of PERI. The possibility of a prompt delivery from the PERI stockyard in Dubai was also a major advantage ...
|
|
The new Meydan Race Course is part of Meydan City in Dubai. It is able to hold 60,000 spectators and hosted the Dubai World Cup for the first time in March 2010.
|
|
The building complex with 58 and 55 floors respectively, stands out through its slim structural shape and features a multiple-folded glass facade as an architectural highlight.
|