PERI L.L.C. United Arab Emirates, Projects - Projects

Projects

Bait Al Barakah Boundary Wall for Royal Affairs, Sultanate of Oman VARIO GT 24 is the wall formwork with ­continuously adjustable element connections for all designs and applications.
Al Muneera, Abu Dhabi, United Arab Emirates At the Al Muneera project in Abu Dhabi, Al Futtaim Carillion chose to use the VARIO GT 24 system for walls and columns as it could be used in all areas, being a versatile system with a built in safety.
Al Rayyan Complex, Sharjah, United Arab Emirates The decisions which formwork system should be used in the different areas were done based on the calculations of the technical support of PERI. The possibility of a prompt delivery from the PERI stockyard in Dubai was also a major advantage ...
VIP Access Bridge, Dubai, United Arab Emirates The new Meydan Race Course is part of Meydan City in Dubai. It is able to hold 60,000 spectators and hosted the Dubai World Cup for the first time in March 2010.
Mixed Use Development, Dubai, United Arab Emirates The building complex with 58 and 55 floors respectively, stands out through its slim structural shape and features a multiple-folded glass facade as an architectural highlight.
The following pages show examples from typical construction sectors. However, the photographs only show the situation on site at the time the photos were taken and although they may offer suggestions, they are therefore not to be taken as indicating the correct way formwork and scaffolding should be used particularly where safety and other details are concerned.