|
At the Al Muneera project in Abu Dhabi, Al Futtaim Carillion chose to use the VARIO GT 24 system for walls and columns as it could be used in all areas, being a versatile system with a built in safety.
|
|
Occupying an area of 6.8 million square metres, Al Raha Gardens will be across from the beautiful beach-front on the Abu Dhabi to Dubai highway poised to become the spectacular new gateway to the city of Abu Dhabi.
|
|
The office tower, which is under construc-tion at the moment, is going to be a multistorey building with 2 basement levels and 13 floors. Sungwon was appointed as contractor for this project and they decided to use PERI as the technical solution ...
|
|
The corewalls in this project are formed with VARIO GT24. The retaining walls are formed with the TRIO panel formwork from which the customer purchased 1000sqm. The slab and beams are supported with 36000 sqm (1200sqm purchased, 24000 sqm rented) ...
|
|
The MotorCity components that are set to be completed in 2009 include the Automall complex within the Business Park MotorCity that comprises of Showrooms, an office building and a hotel building; the residential components of Green Community ...
|