Marina Mall Extension, Abu Dhabi, UAE
The snow world project
PD 8 = fast erection
The already existing part of the Marina Mall was finished 2001.
It covers a gross built area of 125 000 m² and a gross lettable area of
70 000 m² spread over 4 levels. The extension of the mall (Phase II) will include a 32 lane bowling alley and a 4000 m² indoor Alpine themed snow park with ski slopes, ice rink, snow tubing, climbing wall, and other related leisure attractions.
|
| PERI Systems In Use |
PD 8 Table System
MULTIFLEX Girder Slab Formwork
|
|
Arun Benny
Construction Manager
“As a contractor we decided to use PERI for the „snow world project“ because of the complexity of the structure. PERI‘s design and support system has allowed us to execute the job with ease due to its easy handling, fast erection and versatility.“
|
|
| Contractor: |
Nael general Contracting est. |
| Field Service: |
PERI Dubai |
|
Field Service:
|
PERI (L.L.C.), United Arab Emirates
|
|
PERI scope 01.2007 | UAE
|
|