Al Rayyan Complex, Sharjah, United Arab Emirates
Quality and extensive service help to achieve progress
The complex consists of an eight level commercial podium with 14.000 m² each, two basements, two 35-storey residential towers and one 35-storey office tower which adds up to a built up area of 280.000 m². Terna has 30 months to finish construction – therefore they chose to go for the PERI formwork systems to reach a 7 day floor cycle. By using the CB 240 climbing form and PERI table forms with the TK Head for the typical floors, this floor cycle can easily be achieved while keeping a safe working environment and being in need of less manpower.
|
| PERI Systems In Use |
VARIO GT 24 Column formwork
CB Climbing System
|
|
Philip Andriopoulos
Abu Dhabi Branch Manager
We have invested in PERI systems appreciating the quality and extensive service that helped us to achieve the progress and meet the requirement of this project.
|
|
| Contractor: |
Terna S.A. (GEK Terna Group) |
|
Field Service:
|
PERI (L.L.C.), United Arab Emirates
|
|
PERI scope 1 | 2010 Middle East
|