PERI L.L.C. United Arab Emirates, Projects - Number One Dubai Marina, Dubai, United Arab Emirates PERI L.L.C. United Arab Emirates, Projects - Number One Dubai Marina, Dubai, United Arab Emirates PERI L.L.C. United Arab Emirates, Projects - Number One Dubai Marina, Dubai, United Arab Emirates

Number One Dubai Marina, Dubai, United Arab Emirates



PERI SB2 brace frames with single sided vario wall formwork were used to cast 6,0m high basement walls almost 2 basement stories high. The remaining 1,0m was cast with the ground floor slab. This considerably speeded up construction of the basement walls, without ties costly rock anchors.

PERI Multiflex with steel plots was used for the typical floors to give the option of either moving the material to the next floor after striking by crane in pallets or handballing it through openings in the slab. PD8 shoring was used instead of steel props with multiflex decking for the high level slabs.

The PERI Automatic Climbing System ACS was used for the main core for speed and to save carnage time.

PERI Systems In Use
  • ACS R Self Climbing System
  • VARIO GT 24 Girder Wall Formwork
  • MULTIFLEX Girder Slab Formwork
  • SB Brace Frame
  • Field Service: PERI UAE, Dubai
    Contractor: Al Rostamani Pegel L.L.C.
    Field Service: PERI (L.L.C.), United Arab Emirates