PERI L.L.C. United Arab Emirates, Projects - The Tower, Dubai, United Arab Emirates PERI L.L.C. United Arab Emirates, Projects - The Tower, Dubai, United Arab Emirates

The Tower, Dubai, United Arab Emirates




One of the architectural highlights on Dubai’s famous Sheikh Zayed Road is ‘The Tower’. It is until now the 5th highest building in Dubai with 243 m and has 54 floors.

PERI Systems In Use
  • VARIO GT 24 Girder Wall Formwork
  • MULTIFLEX Girder Slab Formwork
  • CB Climbing System
  • The requirement was a 4 days Floor Cylce. Achieved was a 3 days Floor Cycle.
    Main Contractor: NASA Multiplex
    Field Service: PERI UAE, Dubai
    Field Service: PERI (L.L.C.), United Arab Emirates