|
At the Al Muneera project in Abu Dhabi, Al Futtaim Carillion chose to use the VARIO GT 24 system for walls and columns as it could be used in all areas, being a versatile system with a built in safety.
|
|
The new showpiece business centre runs alongside the motorway and is a very impressive 8 km long.
|
|
The newly constructed medical centre is situated on a ridge close to the Jordanian state capital and the Dead Sea. On 120.000 m², the complex offers space for over 300 beds, out-patient treatment premises, a general care unit for the elderly, ...
|
|
Occupying an area of 6.8 million square metres, Al Raha Gardens will be across from the beautiful beach-front on the Abu Dhabi to Dubai highway poised to become the spectacular new gateway to the city of Abu Dhabi.
|
|
The office tower, which is under construc-tion at the moment, is going to be a multistorey building with 2 basement levels and 13 floors. Sungwon was appointed as contractor for this project and they decided to use PERI as the technical solution ...
|