The corewalls in this project are formed with VARIO GT24. The retaining walls are formed with the TRIO panel formwork from which the customer purchased 1000sqm. The slab and beams are supported with 36000 sqm (1200sqm purchased, 24000 sqm rented) ...
|
|
The MotorCity components that are set to be completed in 2009 include the Automall complex within the Business Park MotorCity that comprises of Showrooms, an office building and a hotel building; the residential components of Green Community ...
|
|
The Highland Resort Villas Project consists of 147 villas in Abu Dhabi.
|
|
The Mall, located along the waterfront, is scheduled to open in the second half of 2008. It extends over an area of 42,000 square metres and will have 40,000 square metres of net leasable space.
|
|
ALEC/AJES Joint Venture has been employed to manage the Design and Construction of a 5 Star resort hotel complex in Abu Dhabi located in the Between the Bridges area on the channel that separates the mainland from Abu Dhabi Island.
|